Skip to content
Solar Farm Facts

- 563 kilowatt (kW) Solar photovoltaic (PV) System
- Online: October 2018
- Footprint: 3 acres Golden Valley Electric Association (GVEA) Solar Graphic
- Contractor: ABS Alaskan, Inc.
- Panel manufacturer: CSUN
- Each of the 1,760 panels will generate up to 320 watts.
- Contractor: ABS Alaskan, Inc.
- Cost: $850,000 after a $225,000 grant supplied from United States Department of Agriculture (USDA) Rural Energy for America Program (REAP)
- Annual energy production is estimated to equal the annual energy used in 71 homes (using an average of 660 kilowatt-hours (kWh) per month)
- Located on GVEA property next to BESS and Wilson Substation – Visible from VanHorn Road
口袋梦三国
Sports-platform-feedback@smxjjl.com
博彩平台
你我贷
威海传媒网
芜湖天气预报
太阳城
高端精密
365-Sports-Betting-hr@tt99949.com
皇冠体育
青团社
Sun-City-contactus@dp120.com
恒泰证券
安卓手机软件游戏搜索
昆明招聘网
皇冠体育app
澳门新葡京
bbin视讯
精锐教育
欧洲杯买球
泡泡俱乐部论坛
宏达振动
返还网优惠券
岁月联盟
苏州信息网,
云浮百姓网
中国民主同盟
华融证券
114票务网余票查询
世界名著网
微视
站点地图
SNS游戏交友网小游戏专题
12306抢票软件
世安科技